Vinnytsia works · sheet SPB-01 · 2023
Metal frames and exteriors from Vinnytsia
From 2 prov. Tsehelnyi since 2023, SPB-SERVIS TOV fabricates structural metal, builds foundations and exteriors, installs building equipment, and wholesales nondurable goods.
Shop release
What leaves the works, and in what order
On each job the shop issues a short release list, and the pieces go out in the order the foundation and the exterior need them. The lines below name those pieces for the reference bay on the command plate: an 18 by 36 metre hall with an 8 metre eave.
| Piece | Role on the bay | When it ships |
|---|---|---|
| Primary frame | Portal frames across the 18 metre span. | Before the anchors are set. |
| Secondary steel | Girts and purlins that carry the skin. | With the exterior package. |
| Facade support | Brackets that take the cladding fixings. | With the secondary steel. |
SPB Service Build Network
One desk for the shop, the supply, and the crew
SPB-SERVIS TOV opened in 2023 at 2 prov. Tsehelnyi. From that address it fabricates metal products, wholesales miscellaneous nondurable goods, and contracts foundations, building exteriors, engineering equipment, and specialty trades.
It runs that mix as the SPB Service Build Network: shop metal, direct component supply, and site installation on one Vinnytsia desk. The frame and the facade are priced from the same drawing.
Five scopes
Sold from the Vinnytsia desk
-
01
Nondurable goods wholesale
SPB-SERVIS TOV wholesales miscellaneous nondurable goods to site stores and trade crews in Vinnytsia. Call-offs are tied to a named job. Lots leave 2 prov. Tsehelnyi with the crew that will use them.
-
02
Building equipment contracting
The same desk installs engineering and building equipment once the frame can carry the load. Setting, aligning, and handover are booked against the fabrication slot, not opened as a second contract with a new drawing set.
-
03
Foundations and building exteriors
Foundation and exterior contracting run as one sequence: ground work, the foundation, then facade closure. Brackets and girts for that skin come from the company’s own shop. The office measures the bay before it prices the envelope.
-
04
Specialty trade contracting
Specialty trades are taken where the work locks into the frame, the foundation, or the exterior. Each trade is listed on the drawing set for that building and scheduled from the Tsehelnyi desk.
-
05
Fabricated metal products
The works fabricates metal for primary frames, secondary members, and exterior supports. Cutting and assembly happen in Vinnytsia, and shop time is held to the foundation and exterior dates on that job.
Sheet revisions
Four marks, one drawing set
Four revisions on one sheet. The Vinnytsia desk keeps the mark, and the shop does not redraw the bay for the crew.
-
A
Measure
The desk records span, length, eave, and the scopes, either at 2 prov. Tsehelnyi or on the site, before any steel is cut.
-
B
Shop
Fabrication runs at the works. Frames, secondary steel, and facade supports leave in the order the next revision needs.
-
C
Foundation
The crew sets the foundation to that sheet, including the anchor layout taken from the frames already in the shop.
-
D
Close
Exterior cladding and building equipment follow. Nondurable goods and remaining specialty trades are called off while those crews are still on site.
On the bay
Ground, skin, and a closed exterior
Where the desk works
Vinnytsia, and the oblast around it
Work is taken in Vinnytsia and across Vinnytska oblast. Questions about steel, foundations, and deliveries come back to the same address.
SPB Service Command Panel
Mark the bay, read the band
Switch the scopes the company sells. The drawing marks the zone on a reference hall, and the hryvnia band adds up for that hall only. The plate is a planning tool, not a tender.
Scopes
Takeoff
- Steel on the bay
- 46 t
- Planning band
- ₴4.6–6.1 million
Bands are in hryvnia and describe this reference bay only. The Vinnytsia desk replaces them with a written offer after a site measure.
Enquiry
Send the bay and the scopes
Include the span, the length, and which of the five scopes you need. The desk answers from this office.